Posts

Showing posts from December, 2022

4154 Barry Co Bridge Intermediate Cap Pour

Image
  Lee arrived at 12:47 to pour Bent 2 Cap, First truck arrived at 1:10, Plant was running behind. Lee tested concrete; Air 3.5%, had to add air second test 7%, Slump 4-1/2" and Temp 56°. he made three cylinders and pour began. Next item to do will be placing Rip Rap and building pad for Crane to set beams when ready.

4154 Barry Co Bridge Bent 1 Cap Pour

Image
  I arrived at 11:35 am to Pour Bent 1 Cap, Contractor was ready. First truck arrived at 12:09 pm, I tested concrete; Air 5.1%, Slump 2" and Temp 63°. I made three cylinders and pour started. Next Pour will be the Intermediate Cap.

4154 Barry Co Bridge Bent 3 Pour

Image
  I arrived onsite at 11:00 am to Pour Bent 3 Cap, Contractor was ready but Plant was running behind. First truck arrived at 12:33 pm, I tested concrete; Air 5%, Slump 4" and Temp 61°. Made three cylinders. pour went good. Next pour will be Bent 1 cap.